Cogeneration (WtE) Power Plant in Kaunas LEZ
- Customer: Kauno kogeneracine jegaine
- Owner: FORTUM / JSC Lietuvos Energija
- Completed operations: Technical and Detail design
Details:
- Electrical power ~ 24 MWe.
- Heat power ~ 70 MW.
Completion date:
- Technical design 2020 (second edition)
- Detailed design 2020
