Cogeneration (WtE) Power Plant in Kaunas LEZ

  • Customer: Kauno kogeneracine jegaine
  • Owner: FORTUM / JSC Lietuvos Energija
  • Completed operations: Technical and Detail design

Details:

  • Electrical power ~ 24 MWe.
  • Heat power  ~ 70 MW.

Completion date:

  • Technical design 2020 (second edition)
  • Detailed design 2020